首页> 中文期刊> 《电气:英文版》 >Operation Analysis on TD Equipment in Three Gorges LeftBank Hydropower Station

Operation Analysis on TD Equipment in Three Gorges LeftBank Hydropower Station

         

摘要

The paper outlines the Yangtze Three Gorges water conservancy complex. It describes the power transmission and distribution equipment in the Three Gorges LeftBank Hydropower Station, especially large high-voltage distribution devices. It elaborates the measures for suppressing GIS over-voltage and the tests on VFTO, besides technical measures to ensure safety and stability of power system in the station. It also makes some analyses and summaries about the problems encountered in operation of the equipment.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号