首页> 外文会议>International Conference on Hydropower Technology amp; Key Equipment; ; >Research on Peak Regulation Modes Based on Daily Representative Load for Three Gorges Cascade Hydropower Station
【24h】

Research on Peak Regulation Modes Based on Daily Representative Load for Three Gorges Cascade Hydropower Station

机译:三峡梯级水电站日负荷峰值调节模式研究。

获取原文
获取原文并翻译 | 示例

摘要

Coupled with the demands of Three Gorges project construction process and the characteristic of daily representative load curve of Three Gorges cascade hydropower stations, this paper established peak regulation optimal models. Water head loss and correlation are included in the models, which greatly improve utility and reasonability of these models. Successive approximation method is introduced to solve the peak regulation problems. Furthermore, a revise strategy is also provided to improve cascade joint schedule efficiency. Finally, A case study is served for demonstrating the reasonability and the feasibility of the developed method and some utility rules is induced.
机译:结合三峡工程建设过程的要求和三峡梯级水电站日典型负荷曲线的特点,建立了调峰优化模型。模型中包括水头损失和相关性,这大大提高了这些模型的实用性和合理性。为了解决调峰问题,引入了逐次逼近法。此外,还提供了一种修订策略来提高级联联合进度计划的效率。最后,通过案例研究证明了该方法的合理性和可行性,并得出了一些实用性规则。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号