Computer Supervision and Control System of Three Gorges Left Bank Power Station and Analyze about the Project Execution

机译:三峡左岸电站计算机监控系统及工程实施分析。

获取原文
获取原文并翻译 | 示例

摘要

This article gives a brief introduction to Three Gorges Left bank Power station Computer Supervision and Control System configuration, hardware configuration, system function. Considering the fact that The first unit of Three Gorges Project will be in commercial running in September 2003, analyzes related to those key steps of the project execution such as software development, hardware manufacture, contract equipment delivering, contract equipment installation and commission were given.
机译:本文简要介绍了三峡左岸电站计算机监控系统的配置,硬件配置,系统功能。考虑到“三峡工程”的第一个单元将于2003年9月投入商业运行,因此对与项目执行的那些关键步骤有关的分析进行了分析,例如软件开发,硬件制造,合同设备交付,合同设备安装和调试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号