【24h】

The Impact of Dam Break-managing the Risks

机译:大坝破损管理风险的影响

获取原文

摘要

This paper provides an overview of current developments in the UK relating to dam break and emergency planning. During 2007, two periods of extreme flooding occurred in England which highlighted the potential impact on infrastructure and the wider community that extreme flooding can have. The second flood event resulted in a serious incident at the Ulley Dam, which came very close to failure. The independent review that followed these events has initiated a number of actions, including inundation mapping for all reservoirs (un-der the Water Act, 2003) in England and Wales. At the same time, a review of emergency planning guidance is underway. Linked to the provision of these action plans and inundation maps is the implementation of various R&D initiatives which provide underpinning science,tools, models and methodologies to support practical and effective emergency planning.
机译:本文概述了英国在大坝溃坝和应急计划方面的最新发展。在2007年期间,英格兰发生了两次极端洪灾,突显了极端洪灾可能对基础设施和更广泛的社区造成的潜在影响。第二次洪水事件导致在Ulley大坝发生了严重事故,几乎是失败的。在这些事件发生之后进行的独立审查已采取了许多行动,包括对英格兰和威尔士所有水库的淹没制图(根据《水法》,2003年)。同时,正在进行对应急计划指导的审查。与这些行动计划和淹没图的提供相联系的是各种研发计划的实施,这些计划提供了基础科学,工具,模型和方法来支持切实有效的应急计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号