Seepage and Stability Treatment for Natural Embankment Formed by Earthquake at Xiaonanhai Reservoir

机译:小南海水库地震形成天然路堤的渗流及稳定处理

获取原文

摘要

Xiaonanhai Reservoir embankment was formed by earthquake in 1856. The dam structure is loose, and cavities in dam body are so large that seepage develops in dam body. It is dangerous during reservior operation. Grouting is advised and adopted for this dam rem-edy after careful study by experts. Aarge quantity of clay, fine sand, sodium solicate, and fine aggregate are mixed in cement grout. After grouting, water seepage quantity was re-duced obviously and met the design requirements of seepage stability. The characteristics of grouting in this project are effective, without the damage to dam structure and cost.
机译:孝南海水库路堤是1856年地震形成的。坝体结构疏松,坝体空洞大,导致坝体渗水。在储层操作过程中很危险。经专家仔细研究后,建议对大坝进行灌浆。在水泥浆中混合大量粘土,细砂,硅酸钠和细骨料。注浆后,渗水量明显减少,达到了渗流稳定性的设计要求。该项目的灌浆特点是有效的,不会破坏大坝的结构和成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号