Goupitan arch dam is 232.5 m high, the geological condition of dam foundation is complicate and there are many orifices in the dam body with large scale. The scale and technical difficulty of the arch dam go beyond the control of the active arch dam design criterion. Through referring domestic and overseas design experience and up to date research fruit of high arch dam, many analysis methods and model experiments are adopted, and through the analogy of other engineering, Goupitan arch dam's figure, stress, abutments stability, the whole safety, anti-seism and foundation treatment and so on are studied and analyzed. Finally the arch dam design meet safety, reliability, technical feasibility, economy and rationality.
机译:构皮坦拱坝高232.5 m,坝基地质条件复杂,坝体内有大孔口。拱坝的规模和技术难度超出了主动拱坝设计标准的控制范围。通过借鉴国内外的设计经验和最新的高拱坝研究成果,采用了多种分析方法和模型试验,并通过与其他工程的类比,构皮坦拱坝的外形,应力,桥台稳定,整体安全,抗对地震和地基处理等进行了研究和分析。最终,拱坝设计符合安全性,可靠性,技术可行性,经济性和合理性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号