Analysis of monitoring results of foundation of Left-Bank Powerhouse of Three Gorges Project

机译:三峡左岸电站厂房基础监测结果分析

获取原文
获取原文并翻译 | 示例

摘要

It briefly analyses the basic information on foundation seepage flow and pressure and rock mass sedimentation deformation & horizontal deformation of founation rock mass, on which Left-Bank Powerhouse dam section No. 1 to No. 5 are based, during the construction of superstructure. The preliminary analysis shows that deformation of rock mass is reasonable and foundation anti-leakage and drainage facilities have achieved the anticipated effect. Principally the rock body behind the main drainage wall of the foundation is basically in dry condition. The seepage pressure of the dam foundation and the joint face of deep rock mass are far smaller than the designed value. The dam foundation seepage pressure is safe, and the structure runs normally.
机译:简要分析了上层建筑施工过程中基础堤防渗流,压力,岩体沉降变形和水平岩体变形的基本信息。左岸电站大坝1号至5号坝是以此为基础的。初步分析表明,岩体变形合理,基础防渗排水设施已达到预期效果。主要地基的主要排水壁后面的岩体基本上处于干燥状态。坝基和深部岩体的结合面的渗透压力远小于设计值。大坝基础渗流压力安全,结构正常。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号