Geotechnical instrumentation monitoring of land reclamation projects on soft soil foundations

机译:软土地基上土地复垦项目的岩土仪器监测

摘要

In land reclamation on soft soil formations, ground improvement works are often necessary to be carried out in order to negate future settlement under the projected dead and live loads. In the case of thick deposits of marine clay, it is necessary to accelerate the consolidation process. The use of prefabricated vertical drains with preloading option is a widely-used ground improvement method for such cases. In such ground improvement projects in soft soil, the degree of improvement attained by the marine clay has to be ascertained to confirm whether the soil has achieved the required degree of consolidation to enable surcharge removal. This analysis can be carried out by means of observational methods for which continuous records of ground behavior can be monitored from the date of instrument installation. Field instruments are used to verify the performance of the soil improvement works and to ensure that the specified degree of consolidation due to the sandfill and surcharge loading had been achieved prior to the removal of the surcharge. This paper provides a comparison of the assessment of degree of consolidation by various methods at a case study area at the Changi East Reclamation project in the Republic of Singapore.
机译:在软土地层的土地开垦中,经常需要进行地面改良工作,以免在预计的静载和活载下将来的沉降。对于厚厚的海洋粘土沉积物,有必要加快固结过程。在这种情况下,使用带有预加载选项的预制垂直排水管是一种广泛使用的地面改良方法。在这样的软土地面改良项目中,必须确定海洋粘土所达到的改良程度,以确认土壤是否已达到所需的固结度以去除附加费。可以通过观察方法进行此分析,从仪器安装之日起就可以监视地面行为的连续记录。使用现场仪器来验证土壤改良工程的性能,并确保在去除附加费之前已达到由于填沙和附加费引起的规定固结度。本文对新加坡共和国樟宜东填海项目的案例研究区域中采用各种方法进行的固结度评估进行了比较。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号