首页> 外文会议>International Conference on Computational Science and Its Applications(ICCSA 2006) pt.3; 20060508-11; Glasgow(GB) >Model and Solution for the Multilevel Production-Inventory System Before Ironmaking in Shanghai Baoshan Iron and Steel Complex
【24h】

Model and Solution for the Multilevel Production-Inventory System Before Ironmaking in Shanghai Baoshan Iron and Steel Complex

机译:上海宝山钢铁公司炼铁前多级生产库存系统的模型与解决方案

获取原文
获取原文并翻译 | 示例

摘要

This research deals with the production-inventory problem originating from the ironmaking production system in Shanghai Baoshan Iron and Steel Complex (Baosteel). To solve this multilevel, multi-item, multi-period, capacitated lot-sizing problem, a deterministic mixed integer programming (MIP) model based on the minimization of production and inventory costs is formulated to determine the production and inventory quantities of all materials in each time period under material-balance and capacity constraints. Due to the large-scale variables and constraints in this model, a decomposition Lagrangian relaxation (LR) approach is developed. Illustrative numerical examples based upon the actual production data from Baosteel are given to demonstrate the effectiveness of the proposed LR approach.
机译:本研究解决了上海宝山钢铁联合公司(宝钢)炼铁生产系统中的生产库存问题。为了解决这个多层次,多项目,多周期的,有容量的批量问题,基于最小化生产和库存成本的确定性混合整数规划(MIP)模型被公式化,以确定生产中所有物料的生产和库存数量每个时间段都受到物料平衡和产能限制。由于该模型中的大规模变量和约束,开发了一种分解拉格朗日松弛(LR)方法。给出了基于宝钢实际生产数据的示例性数值示例,以证明所提出的LR方法的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号