【24h】

Practical Test of ACC Systems for Waste to Energy Plants

机译:垃圾发电厂的ACC系统的实践测试

获取原文
获取原文并翻译 | 示例

摘要

The first operating advanced combustion control (ACC) system in Denmark has been installed at the L90 plant and has been in operation for more than one year. The L90 plant is a waste fired power plant burning 24 tonnes of waste per hour. The waste is a mixture of household and industrial waste. This paper will present some of the test results from operating the plant with and without the ACC system. The major findings were a reduction of 40% in the scattering of the steam flow and a reduction of 17% in the scattering of the oxygen level.
机译:L90工厂已经安装了丹麦第一套运行中的先进燃烧控制(ACC)系统,已经运行了一年多。 L90工厂是一座废料发电厂,每小时燃烧24吨废料。废物是家庭和工业废物的混合物。本文将介绍使用和不使用ACC系统运行工厂的一些测试结果。主要发现是蒸汽流的散布减少了40%,氧气水平的散布减少了17%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号