首页> 外文会议>International Conference on Coastal Management; 20031015-20031017; Brighton; GB >Improving coastal flood forecasting services of the Environment Agency
【24h】

Improving coastal flood forecasting services of the Environment Agency

机译:改善环境署的沿海洪水预报服务

获取原文
获取原文并翻译 | 示例

摘要

Preventive flood works are susceptible to overtopping and therefore associated with a residual risk of flooding, during which prime objectives are to save life, minimise damage, reduce disruption to communication lines, mitigate trauma and restore normality. Residual flood risks are managed by provision of information through flood forecasting and warning (FF&W) services for the population at risk of flooding. Lead-time plays a crucial role in the effective delivery of this service. Currently the lead-time is a minimum of 2-hours in England and 1-hour in Wales and the Environment Agency (the Agency) for England and Wales has the lead to provide FF&W services where cost-effective and technically feasible. This paper outlines a review of the Agency's capability on coastal flood forecasting (CFF) and the potentials for improving the lead-time of warning messages. It reports that existing CFF capabilities have normally been based on judgement and empirical approaches, signifying that these services have largely been reactive. An ongoing R&D project is integrating the modelling capability developed by coastal scientists with the wealth of experience gained by the fluvial forecasting community. A potential outcome is a new capability to improve lead-time by detecting the impending incidents, not from the water level at the coastlines alone but, with an insight into the whole processes of the sea-state. This paper outlines best practice in terms of the following elements: 1. Modularisation of the service into separate processes with well defined interfaces. 2. Seeking generic definitions for accuracy, timeliness and reliability. 3. Categorisation of modelling techniques and physical systems. 4. A risk-based and defensible approach to selecting a modelling solution. 5. Integrating FF&W services to other flood management measures.
机译:预防性洪水工程容易过高,因此与洪水的残留风险有关,其主要目标是挽救生命,最大程度地减少损害,减少对通信线路的干扰,减轻创伤并恢复正常。洪水的剩余风险通过洪水预报和预警(FF&W)服务为洪水风险人群提供信息来管理。提前期在有效提供这项服务中起着至关重要的作用。目前,英格兰的交货时间最少为2小时,威尔士的交货时间最少为1小时,英格兰和威尔士的环境署(EA)率先在经济高效且技术可行的情况下提供FF&W服务。本文概述了对原子能机构在沿海洪水预报(CFF)方面的能力以及改进预警消息提前期的潜力的综述。报告指出,现有的CFF功能通常是基于判断和经验方法,这表明这些服务在很大程度上是被动的。正在进行的研发项目正在将沿海科学家开发的建模能力与河流预报社区的丰富经验相结合。潜在的结果是一种新功能,它可以通过检测即将发生的事件来改善交付周期,而不仅仅是从海岸线的水位上,而是可以洞悉整个海州的整个过程。本文根据以下要素概述了最佳实践:1.将服务模块化为具有明确定义的接口的单独流程。 2.寻求准确性,及时性和可靠性的通用定义。 3.建模技术和物理系统的分类。 4.选择模型解决方案的基于风险和可辩护的方法。 5.将FF&W服务与其他洪水管理措施相集成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号