【24h】

IRSN and the period safety reviews related the ten-yearly outages of French nuclear power plants

机译:IRSN和定期安全审查与法国核电厂的十年停运有关

获取原文
获取原文并翻译 | 示例

摘要

The periodic safety reviews (PSR) are important steps in the operation of the French nuclear power plants.rnThe main objectives are:rn? To verify the conformity of the nuclear power plants to their current safety requirements, by meansrnof standard safety studies and of a conformity verification performed at each unit of the series,rn? To enhance the safety level taking into account more recent safety requirements.rnThe PSR process jointly developed by Electricité de France, IRSN and the Nuclear Safety Authority is nowrnwell-defined and operational.rnThe PSR assessment is an important part of the IRSN activity of safety and technical expertise. To providernan objective and well-argued expertise, notably for the safety referential reassessment, the challenges ofrnIRSN are to keep and develop his competence and knowledge about the various technical and safety topics,rnto collect and analyze operational feedback and to define and realize appropriate research and studiesrnprograms.
机译:定期安全评审(PSR)是法国核电站运行中的重要步骤。主要目标是:为了通过标准安全研究和在系列的每个单元上进行的合格性验证来验证核电厂是否符合其当前的安全性要求?为了提高安全级别,同时考虑到更多最新的安全要求。rn法国电力公司,IRSN和核安全局共同开发的PSR流程现已明确定义并投入运营。rnPSR评估是IRSN安全与安全活动的重要组成部分技术专长。为了提供客观且经过充分论证的专业知识,特别是在安全参考重新评估方面,rnIRSN的挑战是保持和发展其对各种技术和安全主题的能力和知识,收集和分析运营反馈以及定义和实现适当的研究和开发。学习程序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号