Each main arch rib of the main span includes 23 segments, 11 on each side and 1 closure segment in the middle. The maximum one weighs 65t. It is adopted non-support cable erection stay buckling method for construction. The main span of the cable crane is 368 m and the height of tower is 125m with the design lifting capacity of 75 t. It is adopted φ 15.24mm steel strand for the buckling rope. And there are 11 bonds of buckling rope at upstream and downstream of each buckling tower respectively, among which, 5 bonds of temporary buckling rope and 6 bonds of permanent buckling rope. It is the first time in China that so many segments to be erected in low-laying land in lake area by high-tower and with non-support cableway and to be spliced in the air one by one.
机译:主跨的每个主拱肋包括23个分段,每侧11个,中间有1个闭合分段。最大一个重65吨。施工中采用无支撑电缆架撑屈曲法。电缆起重机的主跨为368 m,塔高为125 m,设计起重能力为75 t。屈曲绳采用φ15.24mm钢绞线。每个屈曲塔的上游和下游分别有11根屈曲绳,其中临时屈曲5束和永久屈曲6束。在中国,这是中国首次在湖区低地上通过高塔和非支撑式索道架设如此多的路段,并将它们逐段拼接起来。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号