首页> 外文会议>International annual coal processing exhibition and conference(Coal Prep 2011). >Automation of Formally Decommissioned Coal Preparation Facility
【24h】

Automation of Formally Decommissioned Coal Preparation Facility

机译:正式退役的选煤厂的自动化

获取原文
获取原文并翻译 | 示例

摘要

GCI (Systems Integration Company) was invited to participate in the rebirth of the New SaintrnNick, decommissioned coal preparation facility owned by Reading Anthracite. Discussionrnfocuses on the collaborated effort to provide a cost effective control solution and the challengesrnassociated with providing a simplified operation.rnAlthough no prior hands on experience with coal preparation, Reading provided ample processrnflow and P&ID diagrams. With a strong background in process control and material handlingrnsystems, GCI introduced Reading to ISA S88.1i terminology, modeled the entire operation, andrndeveloped a detailed set of functional and design descriptions. Together with invaluablernassistance from the electrical contractor we were able to resurrect the facility to efficientrnoperating capacity. Today, the fine coal plant processes 200 tph (150 tph of run of minernanthracite and 50 tph of reclaimed silt from a local impoundment area). The product is cleanedrnto metallurgical coal specifications.
机译:GCI(系统集成公司)应邀参加了由Reading Anthracite拥有的已退役的新SaintrnNick选煤厂的重生。讨论着重于为提供成本有效的控制解决方案而进行的共同努力以及与简化操作相关的挑战。尽管没有任何以往的选煤经验,但雷丁提供了充足的工艺流程和P&ID图。凭借在过程控制和物料搬运系统方面的强大背景,GCI向ISA S88.1i引入了Reading术语,对整个操作进行了建模,并开发了一套详细的功能和设计说明。加上电力承包商的宝贵帮助,我们得以将工厂恢复到高效运转的能力。如今,细煤厂处理能力为200吨/小时(150吨/小时的南无烟煤和50吨/小时来自当地蓄水区的再生淤泥)。该产品已按照冶金煤的规格清洗。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号