首页> 外文会议>International Congress on Advanced Applied Informatics >Development of a Hybrid Flowshop Scheduling System Considering with Due-Date and Incontrollable Processing Time for MTO Production
【24h】

Development of a Hybrid Flowshop Scheduling System Considering with Due-Date and Incontrollable Processing Time for MTO Production

机译:考虑到到期时间和不可控制的MTO生产时间的混合Flowshop调度系统的开发

获取原文

摘要

This research reported the automation and optimization of hybrid flexible flowshop scheduling (HFS) for make-to-order (MTO) production, particularly for a joint research with a Japanese medium-sized company. As the first, an automated scheduling software was developed to compare several basic and advanced rules for HFS. Secondly, the optimal solution was discussed to involve both a due-date of individual job and the efficiency of parallel machines in HFS for MTO. Gupta algorithm (1988) was extended considering with different processing time of the individual job. As the result of performance evaluations for actual cases, extended Gupta method improved the due-date satisfaction rate by 15% more than the typical rules, while keeping short makespan that means machines are effectively utilized beyond process steps. In addition, computation of the proposed method is very quick (less than 0.04 seconds) even to the problem consisting of 5 machines and around 110 jobs.
机译:这项研究报告了按订单生产(MTO)生产的混合柔性流水车间调度(HFS)的自动化和优化,特别是与日本一家中型公司的联合研究。首先,开发了一种自动调度软件来比较HFS的一些基本规则和高级规则。其次,讨论了最佳解决方案,该方案既涉及单个工作的到期日,又涉及HFS中用于MTO的并行机的效率。考虑到不同作业的处理时间,扩展了Gupta算法(1988)。通过对实际案例进行性能评估的结果,扩展的Gupta方法将到期日期的满意率比典型规则提高了15%,同时保持了较短的制造周期,这意味着可以有效地利用机器进行处理。另外,即使对于由5台机器和大约110个工作组成的问题,所提出方法的计算也非常快(少于0.04秒)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号