首页> 外文会议>International conference on large high voltage electric systems;CIGRE 2000 >HVDC multi-terminal interconnections A viable and optimal solution for India
【24h】

HVDC multi-terminal interconnections A viable and optimal solution for India

机译:高压直流输电的多端子互连印度的可行和最佳解决方案

获取原文
获取外文期刊封面目录资料

摘要

The Western region comprising the states of Madhya Pradesh, Maharashtra, Gujarat and Goa is geographically the largest in India with installed capacity currently around 28000 MW. Peak demand currently around 24000 MW is projected to touch 45000 MW by end of the decade. A large chunk of the increase will have to come from thermal generation located in Eastern Madhya Pradesh and the power will be wheeled to Western Madhya Pradesh, parts of Maharashtra and Gujarat. As the transmission distances involved will be in the range 800 - 1200 kms special attention is called for in transmission system planning.In an earlier report [1], the benefits of an HVDC point-to-point transmission link from Korba to Indore in Madhya Pradesh, becoming an ideal alternative considering the distances involved was discussed. The study also pointed to further benefits in case of upgrading the point-to-point HVDC transmission to one of higher capacity and to a multi-terminal configuration in a phased manner as power needs to be further extended in to Gujarat, west of Madhya Pradesh. This paper examines the potential benefits and cost-effectiveness of the multi-terminal configuration.
机译:西部地区由中央邦,马哈拉施特拉邦,古吉拉特邦和果阿邦组成,是印度最大的地区,目前装机容量约为28000兆瓦。目前的高峰需求目前约为24000兆瓦,预计到本十年末将达到45000兆瓦。增长的很大一部分将来自中央中央邦的火力发电,电力将转至中央邦西部,马哈拉施特拉邦和古吉拉特邦的部分地区。由于所涉及的传输距离将在800-1200 kms范围内,因此在传输系统规划中需要特别注意。在较早的报告中[1],从Korba到Madhya的Indore的HVDC点对点传输链路的好处讨论了成为考虑到距离的理想选择的印度。该研究还指出,在将点对点高压直流输电以分阶段的方式升级为更高容量和多终端配置的情况下,还有进一步的好处,因为电力需要进一步扩展到中央邦西部的古吉拉特邦。 。本文研究了多端子配置的潜在优势和成本效益。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号