首页> 外文会议>International Conference on Intelligent and Innovative Computing Applications >Renewable Energy Sources and Grid Integration in Ghana: Issues, Challenges and Solutions
【24h】

Renewable Energy Sources and Grid Integration in Ghana: Issues, Challenges and Solutions

机译:加纳的可再生能源和电网整合:问题,挑战和解决方案

获取原文

摘要

Due to the high cost of fuel and as unfavourable weather conditions which have affected power generation in Ghana, the country has experienced power crises for the past seven years. Renewable Energy Resources (RES) like wind and solar are being considered by many countries as alternatives for the energy requirements of the country. Ghana's Energy Commission's (EC) report in October, 2017 indicated that, RE contributes 2MW of power to the country's energy mix, representing about 1.73% of the total installed capacity. However, the current EC's energy policy has projected 600MW power through RE in 2030. 340 MW from solar and 260 MW from wind energies. The then Ministry of Energy through the Energy Commission started the rooftop PV programme implementation in early 2016 in some government institutions. The main aim of the rooftop programme was to produce about 200 MW maximum load respite on the national grid as a medium term programme through PV solar technology. However, RE and grid integration has various issues and challenges, large scale RE power generation are mainly connected to the transmission systems and small-scale generation are mostly linked with the distribution system. Direct integration these systems poses a lot of challenges and issues. This paper examines the main issues and proposes some probable solutions for future RE generations and integration.
机译:由于高昂的燃料成本和不利的天气条件影响了加纳的发电,该国在过去七年中经历了电力危机。许多国家正在将风能和太阳能等可再生能源(RES)视为该国能源需求的替代方案。加纳能源委员会(EC)在2017年10月的报告显示,可再生能源为该国的能源结构贡献了2兆瓦的电力,约占总装机容量的1.73%。但是,当前的欧共体能源政策已计划在2030年通过可再生能源发电600兆瓦。太阳能340兆瓦,风能260兆瓦。当时的能源部通过能源委员会于2016年初在一些政府机构开始实施屋顶光伏计划。屋顶计划的主要目标是通过光伏太阳能技术在中期计划中在国家电网上产生约200兆瓦的最大负荷喘息。然而,可再生能源和电网的整合存在各种问题和挑战,大规模的可再生能源发电主要连接到输电系统,而小规模的发电则大多与配电系统联系在一起。这些系统的直接集成带来了很多挑战和问题。本文研究了主要问题,并为未来的RE世代和集成提出了一些可能的解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号