Dulyn/Eigiau water transfer project-Integration of environmental issues

机译:Dulyn / Eigiau调水项目-环境问题整合

获取原文
获取外文期刊封面目录资料

摘要

This project is centred on some 75 square kilometres of the snowdonia National Park in North wales. The area is designated s Site of Special Scientific Interest. Under the European Habitats Directive this area could be designated a Special area Of Conservation. The project arose because of the need to transfer water, destined for public water supply from a high level reservoir to a low level reservoir 5 km away, and the need to minimise the physical environmental impact, by maximising the use of existing facilities. This paper seeks to demonstrate how the project was developed fully integrating environmental issues at every stage of the planning and design process, through effective environmental studies and the involvement of environmental and planning agencies. The project complements the commercial requirements of both an electricity producer and a water supply company and, through an innovative water management scheme, allows an overall improvement in the local environment.
机译:该项目以北威尔士雪墩国家公园约75平方公里为中心。该地区被指定为具有特殊科学意义的地点。根据欧洲人居指令,该区域可以指定为特殊保护区。该项目之所以出现,是因为需要将公共供水的水从高位水库转移到5公里外的低位水库,并且需要通过最大限度地利用现有设施来最大程度地减少物理环境影响。本文力图通过有效的环境研究以及环境和计划机构的参与,来展示该项目是如何在计划和设计过程的每个阶段充分整合环境问题而开发的。该项目满足了电力生产商和供水公司的商业需求,并且通过创新的水管理计划,可以全面改善当地环境。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号