Expanded Study on Criticality in Schedule Plan of Project

机译:项目进度计划中的关键性扩展研究

获取原文
获取原文并翻译 | 示例

摘要

This article mainly concerns with resource-constrained schedule risk and comes up with a method which uses Genetic Algorithm to find out the shortest time of a project and bases on Monte Carlo Simulation to estimate schedule risk. First, a new concept of is proposed, which optimizes the resource constraints and epitomizes the law of diminishing marginal utility of resource. Second, introduce how to take advantage of Genetic Algorithm and Monte Carlo Simulation in schedule-risk-management. Finally, an example manifests that it is effectual of Monte Carlo Simulation to estimate schedule risk and assist decisions in project under resource-constrained circumstances.
机译:本文主要关注资源受限的进度风险,并提出了一种利用遗传算法找出项目最短时间的方法,并基于蒙特卡洛模拟法来估算进度风险。首先,提出了一个新的概念,该概念优化了资源约束并概括了资源边际效用递减的规律。其次,介绍如何在计划风险管理中利用遗传算法和蒙特卡洛模拟。最后,一个例子表明,在资源有限的情况下,蒙特卡洛模拟可以有效地估计进度风险并协助项目决策。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号