首页> 外文会议>Innovative infrastructures-toward human urbanism >Cable-stayed Bridge over the Odra River in Wroclaw, Poland
【24h】

Cable-stayed Bridge over the Odra River in Wroclaw, Poland

机译:波兰弗罗茨瓦夫奥得河上的斜拉桥

获取原文
获取原文并翻译 | 示例

摘要

The largest bridge along the motorway ring road of Wroclaw is a cable-stayed structure over thernOdra River near Redzin water stage of fall. The river flows there in its main bed, while inlandrnnavigation uses additional water channels. An island, where the pylon of the new bridge is situated,rnis located between the river and the channels. The bridge is 1742 m long and consists of a 610 mrnlong southern flyover, a 612 m long cable-stayed main bridge with separate decks suspended to onern122 m high pylon and a 520 m long northern flyover. The superstructure of the main bridge consistsrnof two box girders made of prestressed concrete, one for each carriageway of the highway. Thernheight of the girder is 2.50 m, which is about 1/100th of the main span length. The decks arernsupported by 80 pairs of stay cables connected to the pylon made of reinforced concrete. The bridgernwith a deck area of approximately 65 000 m~2 was constructed within 36 months.
机译:弗罗茨瓦夫高速公路环路上最大的桥梁是索恩奥德拉河上的斜拉结构,靠近秋天的雷津水位。河流在其主要河床中流过,而内陆航行则使用额外的水道。新桥的塔所在的岛,位于河和河道之间的尼斯。这座桥长1742 m,由一条610 mm的南部立交桥,一条612 m长的斜拉主桥组成,主桥有单独的甲板悬挂在ern122 m高的塔上,还有520 m长的北立交桥。主桥的上层建筑由两个由预应力混凝土制成的箱形梁组成,每个高速公路行车道一个。大梁的高度为2.50 m,约为主跨度的1/100。甲板由连接到钢筋混凝土塔架的80对拉索支撑。桥面面积约65 000 m〜2的桥梁在36个月内建成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号