首页> 外文会议>Iron ore 2011 >The Product Quality System at Cliffs Natural Resources – Koolyanobbing Iron Ore Operations
【24h】

The Product Quality System at Cliffs Natural Resources – Koolyanobbing Iron Ore Operations

机译:克里夫斯自然资源公司的产品质量体系–库拉诺布宾铁矿运营

获取原文
获取原文并翻译 | 示例

摘要

Cliffs Natural Resources Pty Ltd (Cliffs) operates iron ore mines in the Koolyanobbing region ofrnWestern Australia. Ore is mined from three separate hubs and trucked to Koolyanobbing. Therernit is crushed and screened to lump and fi nes fi nished products and railed to Esperance port forrnexport to Asian customers. Cliffs is renowned in the marketplace for its consistent product quality.rnIn 2010, 9 Mt of ore was exported to Asia.rnOver the last three years, Cliffs has systematically refurbished its product quality system (PQS), tornimprove effi ciency of production while maintaining its high standard of product quality. Particularrnattention has been given to reducing inventory, which has required signifi cant modifi cations to thernproduction process design.rnIn redesigning the production process, emphasis was placed on maximising the application ofrnthe inherent blending in each of the production process steps and dedicated blending was onlyrnintroduced where essential. Simulation modelling and statistical analysis of process capabilitiesrnwere utilised to develop a system that optimises inventory, minimises rehandle, eliminates severalrndecision-making steps and maintains a pull focus throughout the value chain.rnThe new planning functions are now fully integrated and effectively control long-term gradernvariability rather than relying on long-term stockpiling. The production process design and therndaily crusher blend plan are used to control short-term grade variability. With the upgrading ofrnthe planning processes the accuracy and consistency of algorithms for lump per cent and lump andrnfi nes grades became more important and an increased geometallurgical function has been addedrnto the company.rnThe continuous stockpile management system was upgraded to increase the effectiveness of therndaily crusher blend planning process and is now the sole intervention point in the productionrnprocess for grade-based decisions. Grade control systems were modifi ed to utilise advances inrnsoftware and geostatistics to deliver accurate short range planning models. The reconciliationrnand sampling systems have also been refurbished with an emphasis on practical application andrnfeedback loops.rnAccountability and transparency are provided by management reports that are generated fromrna centralised data warehouse and the introduction of a corrective action system. Standardisedrnreports are available to all stakeholders and a quarterly KPI scorecard assists the managementrnreview process.rnThe successful rejuvenation of the PQS has culminated in operational effi ciency throughrnthe implementation of an integrated end-to-end process fl ow. Shareholder value is maximisedrnthrough maximising recovery of the resource and minimising costs. Customer focus is maintainedrnby reliably delivering product with acceptable and low grade variability.
机译:Cliffs Natural Resources Pty Ltd(Cliffs)在西澳大利亚州的Koolyanobbing地区经营铁矿。矿石是从三个独立的枢纽中开采的,然后运到库拉尼奥宾。将Therernit进行压碎和筛分,以成块和细加工成成品,然后将其运至Esperance港口,出口到亚洲客户。 Cliffs以其稳定的产品质量而在市场上享有盛誉。2010年,有9吨矿石出口到亚洲。rn在过去三年中,Cliffs系统地翻新了其产品质量体系(PQS),在提高生产效率的同时保持了生产效率。高标准的产品质量。特别注意减少库存,这需要对生产过程的设计进行重大修改。在重新设计生产过程时,重点放在最大化固有混合在每个生产过程步骤中的应用,并且仅在必要时才引入专用混合。利用过程能力的仿真建模和统计分析来开发一个系统,该系统可以优化库存,最大程度地减少重新处理,省去决策步骤,并在整个价值链中始终保持着重点。现在,新的计划功能已完全集成,可以有效地控制长期等级变化而不是依靠长期库存。生产工艺设计和每日破碎机混合计划用于控制短期等级变化。随着计划流程的升级,对于成块率和成块和成年品位算法的准确性和一致性变得越来越重要,并且公司还增加了地质冶金功能。rn升级了连续库存管理系统,以提高日常破碎机混合物的有效性计划过程,现在是生产过程中基于等级决策的唯一干预点。修改了坡度控制系统,以利用先进的软件和地统计学来提供准确的短程计划模型。对账和抽样系统也进行了翻新,重点是实际应用和反馈回路。问责制和透明度由从中央数据仓库生成的管理报告以及引入纠正措施系统提供。标准化报告可提供给所有利益相关者,季度KPI记分卡可协助管理层进行审查。PQS的成功复兴通过实施端到端集成流程而达到了最高的运营效率。通过最大程度地提高资源回收率和最小化成本来最大化股东价值。通过可靠地交付具有可接受且低等级变化的产品来保持客户关注。

著录项

  • 来源
    《Iron ore 2011》|2011年|p.563-573|共11页
  • 会议地点 Perth(AU)
  • 作者

    A L Wills; K F Jupp; T J Howard;

  • 作者单位

    Cliff s Natural Resources Pty Ltd, Asia Pacifi c Iron Ore, Level 12, 1 William Street, Perth WA 6000. Email: Alina.Wills@Cliff sNR.com;

    Cliff s Natural Resources Pty Ltd, Asia Pacifi c Iron Ore, Level 12, 1 William Street, Perth WA 6000. Email: KJupp@apijv.com.au;

    Ore Quality Pty Ltd, PO Box 2579, Warwick WA 6024. Email: orequality@bigpond.com;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 铁矿石;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号