首页> 外文会议>IFIP 207; IFIP(International Federat; ; >ENGINEERING TESTING PROCESS MANAGEMENT SYSTEM BASED ON .NET FRAMEWORK
【24h】

ENGINEERING TESTING PROCESS MANAGEMENT SYSTEM BASED ON .NET FRAMEWORK

机译:基于.NET框架的工程测试过程管理系统

获取原文
获取原文并翻译 | 示例

摘要

This paper raises the idea that the traditional way to manage engineering testing documents by hands is not competent for Business Process Reengineering after the author has analyzed the status quo of the engineering testing process management in the auto production industries. The author raises Engineering Testing Process Management (ETPM) system software based on ASP.NET technology to solve the practical problems. Additionally, the architecture of the software and the realization of the system are discussed subsequently. The basic model of the ETPM system software and the prime modules which have been developed are introduced.
机译:在分析了汽车生产行业工程测试流程管理的现状之后,提出了传统的人工管理工程测试文档的方法不能胜任业务流程再造的思想。作者提出了基于ASP.NET技术的工程测试过程管理(ETPM)系统软件,以解决实际问题。此外,随后将讨论软件的体系结构和系统的实现。介绍了ETPM系统软件的基本模型和已开发的主要模块。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号