首页> 外文会议>IEEM'2010;IEEE International Conference on Industrial Engineering and Engineering Management >Medium-term Multi-plant Capacity Planning Problems for Semiconductor Foundry
【24h】

Medium-term Multi-plant Capacity Planning Problems for Semiconductor Foundry

机译:半导体代工厂的中期多工厂产能计划问题

获取原文

摘要

The foundry is an industry whose demand varies rapidly and whose manufacturing process is quite complicated. This paper explores issues of mid-term capacity planning in the foundry. First of all, issues of capacity planning of the foundry are categorized. Secondly, focusing on the multi-site planning, an increment strategy for the number of the accessory tool—'photo mask' is proposed to increase the flexibility of production. The related decisions include how to appropriately allocate the forecast demands of products among multiple sites and decide the production quantities of products in each site after receiving the customer confirmed orders. By constructing the mathematical programming model of capacity planning, it is found that the rates of capacity utilization and customer order fulfillment are effectively enhanced by adding new masks to increase the production flexibility.
机译:铸造厂是一个需求迅速变化且制造过程非常复杂的行业。本文探讨了铸造厂的中期产能计划问题。首先,对铸造厂的产能计划问题进行了分类。其次,着眼于多站点计划,提出了增加辅助工具“光罩”数量的策略,以增加生产的灵活性。相关决策包括如何在收到客户确认的订单后,在多个站点之间适当地分配产品的预测需求,并决定每个站点中产品的生产数量。通过构建容量计划的数学编程模型,发现通过添加新的掩码以提高生产灵活性可以有效地提高容量利用率和客户订单履行率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号