首页> 外文会议>IEEE/IAS Industrial Commercial Power Systems Technical Conference >Common problems in the commissioning of HRG systems
【24h】

Common problems in the commissioning of HRG systems

机译:HRG系统调试中的常见问题

获取原文

摘要

This document discusses some common mistakes that are made in the commissioning of High Resistance Grounding (HRG) systems. While high resistance grounding has been in use for some time, many commissioning teams are less familiar with HRG systems and various issues can arise in the commissioning process. Topics discussed include: compatibility of equipment with HRG systems; how system configuration affects testing and verification; and key points for training programs.
机译:本文档讨论了在调试高电阻接地(HRG)系统时犯的一些常见错误。虽然高电阻接地已经使用了一段时间,但许多调试团队对HRG系统并不熟悉,并且在调试过程中可能会出现各种问题。讨论的主题包括:设备与HRG系统的兼容性;系统配置如何影响测试和验证;和培训计划的重点。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号