It is worthy of note that, the losses of converter station are mainly composed of the losses of valves and converter transformers. To decrease the total losses of the high voltage direct current system, the losses of valves and converter transformer should be considered and critically investigated. In view of this, it is expedient to determine and calculate the power loss profile of the HVDC thyristor valves and converter transformer in order to have an overview of how to decrease the total losses of the high voltage direct current system. Therefore, it is the purpose of this study to investigate various methods of determining the load losses of converter transformer. Subsequently, two of the methods are used to calculate the load losses of the HVDC converter transformer in order to validate the results. More so, this research work also explicitly discuss the procedures to provide total loss figures for thyristor valves during operating and standby conditions, based on the summation of individual loss components. This study was done in accordance with the formulas in IEC standard 61803, Determination of Power Losses in High-voltage Direct-Current (HVDC) Converter Stations alongside.
机译:值得注意的是,换流站的损耗主要由阀门和换流变压器的损耗组成。为了减少高压直流系统的总损耗,应考虑并严格研究阀门和换流变压器的损耗。鉴于此,确定和计算HVDC晶闸管阀和换流变压器的功率损耗曲线是有利的,以便对如何减少高压直流系统的总损耗有一个总体了解。因此,本研究的目的是研究确定转换器变压器负载损耗的各种方法。随后,使用两种方法来计算HVDC换流变压器的负载损耗,以验证结果。更重要的是,这项研究工作还根据单个损耗分量的总和,明确讨论了在工作和待机状态下提供晶闸管阀总损耗数值的程序。这项研究是根据IEC标准61803“高压直流(HVDC)换流站中功率损耗的确定”中的公式进行的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号