首页> 外文会议>IEEE PES GTD Grand International Conference and Exposition Asia >Minimized Financial Losses Due to Interruptions and Voltage Sags with Consideration of Investment Cost
【24h】

Minimized Financial Losses Due to Interruptions and Voltage Sags with Consideration of Investment Cost

机译:考虑到投资成本,将因中断和电压暂降引起的财务损失降至最低

获取原文

摘要

This paper presents an analysis of minimized financial losses due to interruptions and voltage sags with consideration of investment cost. The Modified RBTS Bus 2 test system was used for simulations and Information Technology Industry Council (ITIC) curve was assumed to be a voltage tolerance curve for sensitive industrial customers. Two types of lines were considered: overhead lines and underground cables. Monte-Carlo simulations were used to simulate faults on lines in the Modified RBTS Bus 2 test system. Numbers of unacceptable interruptions and voltage sags were estimated from fault simulations. Results showed that changing certain overhead lines to underground cables can yield minimized financial losses due to interruptions and voltage sags with consideration of investment cost.
机译:本文介绍了一种考虑到投资成本的,因中断和电压骤降而导致的财务损失最小化的分析方法。修改后的RBTS总线2测试系统用于仿真,信息技术行业委员会(ITIC)曲线被认为是敏感工业客户的电压容差曲线。考虑了两种类型的线路:架空线和地下电缆。在改进的RBTS总线2测试系统中,使用蒙特卡洛模拟来模拟线路上的故障。从故障仿真中估计了不可接受的中断和电压骤降的数量。结果表明,考虑到投资成本,由于中断和电压骤降,将某些架空线换成地下电缆可以产生最小的财务损失。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号