首页> 外文会议>IEEE international conference on industrial engineering and engineering management;IEEM'2009 >Study on Work Improvement in a Packaging Machine Manufacturing Company
【24h】

Study on Work Improvement in a Packaging Machine Manufacturing Company

机译:包装机械制造企业工作改进研究

获取原文

摘要

This paper studies the improvement of production efficiency and balance rate of the manual assembly line in a packaging machine manufacturing company. MODular Arrangement of Predetermined Time Standards (MODAPTS) method is used to obtain time values for elements and for entire operations of the manual assembly line. Also the ECRS four principles (Eliminate,Combine,Rearrange and Simple) are used to minimize the idle time at every station or the percentage of line balance loss. In order to verify the results that were obtained from the generated line-balancing pre- and post-,Witness simulation software is used to estimate the output. Simulation results showed that productivity increases about 41.72% higher than the current situation.
机译:本文研究了包装机械制造公司中手动装配线的生产效率和平衡率的提高。预定时间标准的模块化安排(MODAPTS)方法用于获取元素的时间值以及手动装配线的整个操作的时间值。此外,ECRS的四个原则(消除,合并,重新排列和简单)用于最小化每个站点的空闲时间或线路平衡损失的百分比。为了验证从生成的线路平衡前后获得的结果,使用见证仿真软件来估计输出。仿真结果表明,生产率比当前情况提高了约41.72%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号