首页> 外文会议>IEEE Grenoble Power Tech >Procedure of fault management in distribution networks with distributed generation
【24h】

Procedure of fault management in distribution networks with distributed generation

机译:分布式发电的配电网故障管理流程

获取原文

摘要

This paper proposes a procedure of adjustment of settings of overcurrent protections for distribution networks when distributed generation is incorporated in. Then, the procedure establishes the required steps to detect faults, isolate faulty zones, detect and create possible island modes, and finally restore the total operation of the system in order to meet the objective of protection's adaptation. So, the procedure identifies the required adjustments for the protection devices involved in the system. This paper also proposes a computational method to adjust automatically the settings of protective devices in an interactive simulation environment, which gives information about the system topology and its protection devices as well as messages in each step of the protection procedure after a change in the system, is detected. Finally, a conceptual architecture that would be required for the implementation of the independent adaptive protection scheme is presented.
机译:本文提出了一种将分布式发电并入时调整配电网过流保护设置的程序。然后,该程序确定了检测故障,隔离故障区域,检测并创建可能的孤岛模式并最终恢复总数的必要步骤。为了满足保护适应性目标而运行的系统。因此,该过程确定了系统中涉及的保护设备所需的调整。本文还提出了一种在交互式仿真环境中自动调整保护设备设置的计算方法,该方法可提供有关系统拓扑及其保护设备的信息,以及在系统更改后保护过程的每个步骤中的消息,被检测到。最后,提出了实现独立自适应保护方案所需的概念体系结构。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号