In the Hydro Power business the scope of a project varies from designingrncomponents for a turbine or generator to building a complete power plant. Arnproject that includes a complete plant has the highest complexity but at the samerntime opens the opportunity to optimize the components and the design to yieldrnthe best plant operation for the owner.rnThe Holtwood Powerstation, owned by PPL, is a new generating station to bernbuilt adjacent to the existing Holtwood Hydroelectric Project built in 1910. Thernexisting plant power output is 107 MW (143,432 hp) and has a flowrate of 892rncms (31,500 cfs). The new power station will add two vertical Kaplan machines,rneach with a rated output of 59.2 MW (79,380 hp) and passing an additionalrnflowrate of 424.7 cms (15,000 cfs). The contract for the turbines, generators andrnhydroautomation was awarded to Voith Siemens Hydro Power Generation, Inc. inrnSeptember, 2006. This paper will provide an overview of the organization of thernproject team and the methods used to complete the engineering work.rnThe Holtwood Powerstation, being a new plant, required the coordinated effortsrnof multiple engineering disciplines with the owner, consultant and variousrnsuppliers. The Voith Siemens Hydro project team structure and project executionrnprocess is designed to achieve this type of coordination. The benefits of therncoordinated effort included the full and early awareness of the customer'srnexpectations; the early and thorough sharing of insights across the board for thernengineering details needed; and the increased efficiency from avoiding delaysrnand rework. By executing the honed pre-defined process, the team was able tornproduce high-quality equipment designs for PPL's proposed project.rnOf particular interest is the project structure which allowed the project designrnteams for the turbines, generators and hydroautomation to work together with thernowner and the owner's engineering consultant prior to release for manufacturing.rnThis had its advantages and particular challenges that needed to be managedrnso that the proper technical information would be available when needed.rnThis project, being an expansion of an existing power plant, combines thernopportunities to optimize the components of a plant with the challenges ofrnapplying control concepts and design that are not different from the existingrnpower station.
机译:在水电业务中,项目范围从设计涡轮机或发电机的组件到建造完整的发电厂不等。 Arnproject包括一个完整的工厂,具有最高的复杂性,但同时也为优化组件和设计提供了机会,为业主带来了最佳的工厂运营。PPL拥有的Holtwood电站是在附近建造的新发电站现有的Holtwood水力发电项目建于1910年。现有的电站输出功率为107 MW(143,432 hp),流量为892rncms(31,500 cfs)。新电站将增加两台立式Kaplan机器,每台机器的额定输出为59.2 MW(79,380 hp),并通过424.7 cms(15,000 cfs)的额外流量。福伊特西门子水力发电有限公司于2006年9月获得了涡轮机,发电机和水力发电自动化的合同。本文将概述项目团队的组织以及完成工程工作的方法。新工厂需要业主,顾问和各种供应商的多方工程学科的共同努力。福伊特西门子水电项目团队的结构和项目执行过程旨在实现这种协调。协调工作的好处包括对客户期望的全面和早期认识;全面,尽早,全面地分享所需的工程细节见解;并且避免了延迟和返工,从而提高了效率。通过执行经过磨练的预定义过程,该团队能够为PPL的拟议项目提供高质量的设备设计。特别令人感兴趣的是项目结构,该项目结构使涡轮机,发电机组和水力自动化的项目设计团队能够与业主和电力公司一起工作。所有者的工程顾问,然后才能进行制造。rn这具有优势和特殊挑战,需要加以管理。rn,以便在需要时可以提供适当的技术信息。rn该项目是对现有电厂的扩展,结合了机遇,可以优化组件。电厂面临的挑战是应用控制概念和设计与现有电站没有什么不同。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号