A Study on the Connection Method of Wooden Structure Found at Geuklakjeon Hall of Bongjeongsa Temple in Korea

机译:韩国奉正寺Ge子殿内木结构连接方法的研究

获取原文
获取原文并翻译 | 示例

摘要

This study examines the connection method of wooden architecture found through the repair process of Geuklakjeon Hall (极乐殿) of Bongjeongsa Temple (凤停寺) in Korea, which was constructed in Goryeo(918—1392) Dynasty. This research also deals with the characteristics of the structure and construction method through the findings of the connection method. The scope of the study is on the column, the bracket set, and the frame structure of Geuklakjeon Hall. On Geuklakjeon Hall, column is connected with sill (下引枋 ) and penetrating tie(昌枋). Joints used between column and sill are tenon(榫头), double (双榫头), and dovetailed double tenon joint. Joints used between column and penetrating tie are tenon and Sagwae (cross joint). Joints used between each penetrating tie are stepped dovetailed joint. In the structure of Geuklakjeon Hall, it was found that front rear and left right side used the different connection method. It is due to the reason that side of the hall and inner part structured with the middle height of columns(中高柱) is different. The frame structures such as main beams (大梁), end beams (宗梁), middle bracket posts (包童子柱 ), are connected with the joint and splice method. The center bay and side elevation bay are constructed with the different frame and construction method. In particular, the frame structure of the side has tall column(高柱) which is connected with beams and penetrating ties. Through the study mentioned above, it is found that the connection methods are highly related with the plan, structure, and construction method to construct a building.
机译:本研究考察了在高丽(918—1392年)建造的韩国凤停寺极乐殿Geuklakjeon Hall(极乐殿)的修复过程中发现的木制建筑的连接方法。这项研究还通过对连接方法的发现来研究结构和构造方法的特点。研究的范围是在Geuklakjeon Hall的柱子,支架组和框架结构上。在Geuklakjeon Hall上,柱子与窗台(下引枋)和穿透领带(昌枋)相连。圆柱和窗台之间使用的接头为榫头(榫头),双(双榫头)和燕尾榫双榫头接头。立柱和穿透扎带之间使用的接缝是榫和Sagwae(交叉接缝)。每个穿透式扎带之间使用的接头为阶梯形燕尾榫接头。在Geuklakjeon Hall的结构中,发现前后左右使用了不同的连接方法。这是由于厅堂的侧面和内部构造为中高柱的中间高度不同的原因。框架结构(例如,大梁),端梁(宗梁),中间支架柱(包童子柱)以接头和拼接法连接。中央机架和侧面高架机架采用不同的框架和构造方法进行构造。特别地,侧面的框架结构具有高柱,该高柱与梁和贯穿扎带连接。通过上述研究,发现连接方法与建造建筑物的计划,结构和施工方法高度相关。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号