Lessons Learned from Ground Modification Program Using Grout in Karst for I-70 in Frederick, Maryland

机译:在马里兰州弗雷德里克的I-70岩溶地区使用Grout进行地面改造计划的经验教训

获取原文
获取原文并翻译 | 示例

摘要

The I-70/ MD 85 Interchange, MD 355 and MD 475 Interchange Reconstruction Project is an improvement project for the existing alignment of I-70 as it passes on the south side of the city of Frederick, Maryland. This project occupies an active karst area underlain by Cambrian and Ordovician limestones. Historically, sinkholes have been very problematic for transportation facilities. Consequently, major aspects of this project are ground modification for the sinkhole prone areas and unique storm water management facilities. The storm water management system includes three lined ponds, a 600-foot long earth dam, geotechnical instrumentation, and two pump stations. The past success of Maryland's subsurface grouting program for addressing sinkholes in existing roadways led to the decision to incorporate subsurface grouting as a preventive measure in capital highway projects in sinkhole prone areas. In 2006, the grouting program for the I-70 improvement project included 681 grout holes and 42,227 cubic yards of grout. Management of this program required daily interpretation of a plethora of subsurface data Drill and grout data was entered into a computer with a 3D software program to develop grout hole location maps, depth tb top of rock, and grout-take contdur maps. These maps were used to guide grouting operations, and to determine the need for secondary grout holes. This paper will also cover the geologic setting, the field exploration, and sinkhole-related designs. The subsurface karst conditions encountered during construction were more developed than predicted, resulting in large grout volumes and impacts to the project schedule. Modifications were made to the drilling and grouting strategy. Lessons learned will be discussed. Evaluation is still in progress; however, the grouting program appears to have achieved stabilization at the roadway and structure locations.
机译:I-70 / MD 85交换,MD 355和MD 475交换重建项目是对I-70的现有路线的改进项目,因为它经过了马里兰州弗雷德里克市的南侧。该项目位于寒武纪和奥陶纪石灰岩之下的活跃岩溶地区。从历史上看,污水坑对于运输设施一直是个很大的问题。因此,该项目的主要方面是对容易发生塌陷区的地面进行改造,并采用独特的雨水管理设施。雨水管理系统包括三个带衬砌的池塘,一个600英尺长的土坝,岩土工程仪表和两个泵站。马里兰州过去用于解决现有道路下沉坑的地下灌浆计划的成功经验,导致决定将地下灌浆作为一项预防措施纳入易发生下沉孔的首都高速公路项目的决定。 2006年,I-70改进项目的灌浆计划包括681个灌浆孔和42,227立方码灌浆。管理该程序需要每天对大量地下数据进行解释。将钻探和灌浆数据输入到装有3D软件程序的计算机中,以开发灌浆孔位置图,岩层深度tb和灌浆量控制图。这些地图用于指导灌浆操作,并确定是否需要二次灌浆孔。本文还将介绍地质环境,野外勘探以及与井眼有关的设计。施工过程中遇到的地下岩溶条件比预期的要发达,导致灌浆量大,并对项目进度产生影响。对钻探和灌浆策略进行了修改。将讨论所学到的教训。评估仍在进行中;但是,注浆程序似乎已在巷道和结构位置实现了稳定。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号