首页> 外文会议>ISRM 2011;ISRM international congress on rock mechanics >Geotechnical and monitoring challenges during excavation of a large urban tunnel in soft ground and low overburden
【24h】

Geotechnical and monitoring challenges during excavation of a large urban tunnel in soft ground and low overburden

机译:软土地基和低覆盖层的大型城市隧道开挖中的岩土工程和监测挑战

获取原文

摘要

For infrastructure projects with shallow overburden a comprehensive geotechnical monitoring program and its implementation in the daily operation is essential for a successful and safe completion of the works. A continuous control of both the tunnel and the surface according to the observational method within a strict geotechnical safety management is one of the most challenging tasks for such projects. The paper describes - from the point of view of the project's geotechnical on-site engineer and the designer - with two case histories the geotechnical and monitoring challenges at the OeBB Lainzer Tunnel lot LT 31.
机译:对于覆盖层浅的基础设施项目,全面的岩土工程监测计划及其在日常操作中的实施对于成功,安全地完成工程至关重要。在严格的岩土安全管理中,根据观测方法对隧道和地面进行连续控制是此类项目最具挑战性的任务之一。本文从项目的岩土工程现场工程师和设计师的角度描述了OeBB Lainzer隧道LT 31地段的两个岩土历史和岩土工程和监测方面的挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号