Remediation of flood damage on the Toowoomba Range Railway, Queensland, Australia

机译:修复澳大利亚昆士兰州图文巴山脉铁路上的洪水灾害

获取原文
获取原文并翻译 | 示例

摘要

The Toowoomba Range Railway is located on the eastern side of the Great Dividing Rangernapproximately 110 km west of Brisbane, Australia and was originally constructed in 1867. This localityrnin the Upper Lockyer Valley is characterised by steep terrain with surface elevations reachingrnapproximately 600 m above sea level. Following the flash flood events of January 2011, the railwayrnsustained significant damage including washouts of embankments and culverts, failure of upsloperncuttings, destruction of a bridge and damage to a gas pipeline. A geotechnical assessment wasrnundertaken along a 25 km length of railway and over 100 failure features were identified as having anrnimpact on operation of the railway. Twenty failure features were considered significant in nature andrnrequired engineering input during the remedial design and/or reconstruction phase. Initial estimates byrnQueensland Rail predicted a 3 to 6 month repair program. Detailed topographic information forrnselected sites was obtained by an aerial photogrammetric survey from a manned helicopter using thern3DM Analyst digital photogrammetry system. Reconstruction of the flood-damaged earthworks andrnculverts utilised robust solutions that could be implemented quickly and this typically comprisedrnexcavation of failed material and replacement with rockfill, installation of large steel culverts, and atrnone location the use of pre-cast concrete L-section panels to retain a steep rockfill embankment. A sixrnweek program of investigation, pile design and construction was implemented for replacement of therndamaged bridge. The first train resumed service on 28th March 2011, about two and a half monthsrnafter the flood, which was well ahead of schedule.
机译:图文巴范围铁路位于澳大利亚布里斯班以西约110公里的大分水岭东侧,始建于1867年。该地区位于洛克基河上游山谷,地势险峻,地势海拔约600 m。在2011年1月的山洪暴发之后,这条铁路遭受了重大破坏,包括路堤和涵洞的冲刷,上坡路failure的破坏,桥梁的破坏以及天然气管道的破坏。沿着25公里长的铁路进行了岩土工程评估,并确定了100多个故障特征对铁路的运营产生了影响。在补救设计和/或重建阶段,二十个故障特征被认为具有重要的意义和工程要求。昆士兰铁路公司(Queensland Rail)的初步估计是一个3到6个月的维修计划。通过使用3D Analyst数字摄影测量系统从载人直升机进行的航空摄影测量勘测获得了选定地点的详细地形信息。洪水泛滥的土方工程和涵洞的重建采用了可以快速实施的强大解决方案,通常包括开挖失败的材料并用堆石料代替,安装大型钢涵,以及在预制工地使用预制的L型截面混凝土板进行固定陡峭的堆石路堤。为了更换损坏的桥梁,实施了为期六周的调查,桩设计和施工计划。首班火车于2011年3月28日恢复服务,大约在洪水发生两个半月后,提前了。

著录项

  • 来源
  • 会议地点 Melbourne(AU)
  • 作者单位

    147 Coronation Drive, Brisbane 4064, Australia, PH (617) 3721-5400, FAX (617) 3721-5401, email: grogos@golder.com.au;

    147 Coronation Drive, Brisbane 4064, Australia, PH (617) 3721-5400, FAX (617) 3721-5401;

    147 Coronation Drive, Brisbane 4064, Australia, PH (617) 3721-5400, FAX (617) 3721-5401;

    147 Coronation Drive, Brisbane 4064, Australia, PH (617) 3721-5400, FAX (617) 3721-5401;

    Queensland Rail, Rail Centre 2, Level 7, 309 Edward Street, Brisbane 4001, Australia, PH (617) 3072-2511, FAX (617) 3235- 2546, email: Netra.Gurung@qr.com.au;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    railway; flood; slope stability; bridge; rockfill; culverts;

    机译:铁路;;洪水;;边坡稳定性;;桥梁;;堆石;;涵洞;