A sand quarry was excavated up to 20 m deep in the south eastern suburbs of Melbourne in the latern1970s and early 1980s. Following exhaustion of resources at the site, the pit was backfilled withrnpredominantly non-putrescible material, most of which was not placed in a controlled manner. Fillingrnwas largely complete to near original ground surface level by 1989. To assess whether the site couldrnbe developed for residential purposes, an understanding of the residual settlement characteristics ofrnthe fill was required. Two trial embankments were constructed to pre-load the ground and inducernsettlement within the fill. The associated settlement monitoring program indicated settlement occurredrnin two stages, an initial “large” settlement occurring in the first few days following load application, withrna “smaller” ongoing settlement continuing at a much slower rate post loading. The results of thernmonitoring program formed the basis on which to assess the risks associated with the construction ofrnmedium density residential dwellings. The understanding of pre-loading and site grading works onrnsettlement of the proposed structures, pavements and services were all identified as risks to therndevelopment. These risks are discussed in this paper along with the adopted approach to preparing thernsite.
机译:1970年代末期和1980年代初,在墨尔本东南郊区的一个采石场开挖了20 m深。在现场资源枯竭之后,该坑被回填了主要是不可混泥的材料,大部分材料没有以可控的方式放置。到1989年,填土工作已基本完成,接近原始地面水平。为了评估该场地是否可以用于居住目的,需要了解填土的剩余沉降特征。建造了两个试验路堤,以预加载地面并在填土中诱导沉降。相关的沉降监测程序表明沉降发生在两个阶段,最初的“大”沉降发生在施加荷载后的头几天,而“较小的”正在进行的沉降以加载后的缓慢速度继续。监控程序的结果构成了评估与建造中等密度住宅相关的风险的基础。理解对拟议的结构,人行道和服务的沉降进行预压和场地平整工作的理解均被视为对发展的风险。本文讨论了这些风险以及采用的准备网站的方法。

著录项

  • 来源
  • 会议地点 Melbourne(AU)
  • 作者

    D. A. Gallagher; M. C. Ervin;

  • 作者单位

    Golder Associates Pty Ltd, Botanicca Corporate Park, 570 – 588 Swan Street, Richmond, Victoria 3122, Australia, PH (03) 8862 3500, FAX (03) 8862 3501, emails: dgallagher@golder.com.au;

    Golder Associates Pty Ltd, Botanicca Corporate Park, 570 – 588 Swan Street, Richmond, Victoria 3122, Australia, PH (03) 8862 3500, FAX (03) 8862 3501, emails: mervin@golder.com;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    risk; settlement; landfill; monitoring program;

    机译:风险;解决;填埋;监控程序;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号