首页> 外文会议>Global thinking in structural engineering: recent achievements : report >Design of semi-integral and integral high-speed railway bridges – Experiences with the Gruben Viaduct and Gaensebach Viaduct
【24h】

Design of semi-integral and integral high-speed railway bridges – Experiences with the Gruben Viaduct and Gaensebach Viaduct

机译:半整体和整体式高速铁路桥梁的设计– Gruben高架桥和Gaensebach高架桥的经验

获取原文
获取原文并翻译 | 示例

摘要

In the course of one of the biggest infrastructure developments of the German Railway AuthorityrnDeutsche Bahn AG after the German reunification, the New High-Speed Railway line VDE8rn(Verkehrsprojekt Deutsche Einheit Nr. 8) connecting the cities of Nuremberg and Berlin, severalrninnovative bridge structures have been designed and built or are currently under construction, respectively.rnA special feature of these bridges is the use of continuous, multi-span pre-stressed concrete girdersrnas well as the waiving of structural bearings for the support of the superstructure. Instead of bearings,rnmonolithic connections of the substructure and the superstructure are used in order to improvernrobustness and to reduce maintenance cost. These bridge types are therefore called “integral” orrn“semi-integral” bridges, the latter, since these bridges have bearings only at the abutments.rnIntegral and semi-integral railway bridges for high-speed railway traffic raise several technical challengesrnand furthermore a couple of additional approval procedures. Among the technical challengesrnsuch as proof of rail-stresses for longer bridges, proof of dynamical stability under design speed,rnand fatigue behaviour of monolithic connections need particular attention and handling.rnThe experiences made in the field of the design and the construction of semi-integral high-speedrnrailway bridges shall be demonstrated on the basis of two bridges, which were designed by schlaichrnbergermann und partner, the new Grubental Bridge and the new Gaensebachtal Bridge.
机译:在德国统一后德国铁路管理局(Deutsche Bahn AG)最大的基础设施发展过程中,连接纽伦堡和柏林城市的新高速铁路线VDE8rn(Verkehrsprojekt Deutsche Einheit Nr。8)修建了数座创新的桥梁结构这些桥梁的一个特殊功能是使用连续的,多跨度的预应力混凝土大梁以及免除用于支撑上层建筑的结构轴承。代替轴承,使用下部结构和上部结构的整体式连接以提高牢固性并降低维护成本。这些桥类型因此被称为“整体”或“半整体”桥,因为这些桥仅在桥台处具有轴承。rn用于高速铁路交通的整体和半整体铁路桥提出了一些技术挑战。其他批准程序。在技​​术挑战中,例如较长桥梁的钢轨应力证明,设计速度下的动力稳定性证明,整体式连接的疲劳特性等都需要特别注意和处理。在设计和半整体式构造领域取得的经验高速铁路桥梁应在schlaichrnbergermann及其合作伙伴设计的两座桥梁的基础上进行演示,这是新的Grubental桥梁和新的Gaensebachtal桥梁。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号