首页> 外文会议>Global Accomplishments in Environmental and Radioactive Waste Management: Cost Effectiveness, Risk Reduction and Technology Implementation >ESTABLISHING A CONTACT HANDLED TRANSURANIC WASTE SHIPPINGPROGRAM AT THE WEST VALLEY DEMONSTRATION PROJECT
【24h】

ESTABLISHING A CONTACT HANDLED TRANSURANIC WASTE SHIPPINGPROGRAM AT THE WEST VALLEY DEMONSTRATION PROJECT

机译:在西谷示范项目建立联系式的可处理废物运输计划

获取原文
获取原文并翻译 | 示例

摘要

The West Valley Demonstration Project (WVDP) Act of 1980 authorized the Department of Energyrn(DOE) to among other things, solidify the high-level liquid radioactive waste (HLW) present at the WestrnValley site, along with disposing of the low-level and transuranic (TRU) wastes. Since the completion ofrnHLW solidification in 2002, the WVDP has turned its attention to decontamination and decommissioningrnof Project facilities and disposing of the wastes generated throughout performance of the Project.rnThe TRU waste generated over the course of the Project has been placed into safe storage and is managedrnby the West Valley Nuclear Services Company (WVNSO) for the DOE. To address DOE’s goal tornaccelerate site cleanup and TRU waste disposition, a strategy was developed to gain approval to shiprnwaste to a designated DOE facility which already has the capability to characterize and certify TRUrnwaste.rnThe WVDP evaluated various options for the development of a WVDP TRU Waste Program. The chosenrnoption resulted in a program that utilizes the existing characterization and shipping program at the WVDPrnto interface with both the Waste Isolation Pilot Plant (WIPP) Central Characterization Project (CCP) forrnutilization of TRUPACT-II shipping containers and a WIPP-certified DOE facility. It is this interface thatrnenables WVDP TRU waste to be characterized for shipment, transported to a WIPP- certified facility forrnfinal characterization, and ultimately shipped to WIPP for disposal. The following paper discusses thernsteps taken to develop the WVDP TRU Waste Program.
机译:1980年的《西谷示范项目(WVDP)法案》授权能源部(DOE)除其他事项外,还可以固化存在于WestrnValley现场的高含量液态放射性废物(HLW),并处置超铀(TRU)废物。自2002年完成高放废物的固化以来,WVDP已将其注意力转移到项目设施的去污和退役以及在项目整个执行过程中产生的废物的处理。由西谷核服务公司(DOV)管理。为了实现DOE加速现场清理和TRU废物处置的目标,制定了一项战略,以批准将废船运到指定的DOE设施,该设施已经具有表征和认证TRUrnwaste的能力。WVDP评估了开发WVDP TRU废物的各种选择。程序。选择的方案产生了一个程序,该程序利用WVDPrn上的现有表征和运输程序与用于TRUPACT-II运输容器的废品分离试验厂(WIPP)中央表征项目(CCP)和经WIPP认证的DOE设施的接口。正是这个接口使WVDP TRU废物得以表征以进行装运,然后被运至WIPP认证的设施进行最终表征,最后被运至WIPP进行处置。下文讨论了开发WVDP TRU废物计划所采取的步骤。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号