The Penola Project, South Australia: A Unique Hot Sedimentary Aquifer Development, Limestone Coast, South Australia

机译:南澳大利亚的Penola项目:独特的热沉积含水层开发,南澳大利亚的石灰石海岸

获取原文
获取原文并翻译 | 示例

摘要

Panax Geothermal Ltd ("Panax") has secured several Geothermal Exploration Licences (GELs), over four Hot Sedimentary Aquifers (HSA) within troughs or grabens in the Otway Basin in southeast South Australia, covering an area of more than 3,000 km~2. The Limestone Coast Geothermal Project is designed to deliver the first proof that conventional geothermal resources within Australia's sedimentary basins can be used to generate large amounts of competitively priced, zero-emission, base-load power. Due to an existing comprehensive database acquired by the petroleum industry, the initial development of its Limestone Coast Geothermal Project is focused on the Penola Trough (GEL223).rnThe Penola Trough has been subjected to intensive oil and gas exploration, including 27 deep petroleum wells with wireline logging and conventional core measurements of reservoir porosity and permeability. In addition, there are 271 km~2 of 3D seismic and a significant amount of 2D seismic data, as. These data are available as part of the Open File data base and studies have shown that the over 1,000m thick Cretaceous Pretty Hill Formation (sandstones) of the Penola Trough has the capacity to deliver geothermal waters of >140℃ at high volumes, sufficient for the operation of a commercial, medium temperature geothermal power plant. The generating potential is large, as is evidenced by a recent independent Geothermal Resource assessment, which has estimated a "Measured Geothermal Resource" of 11,000 PJ for the Penola Trough.rnThe first well, Salamander 1, is the first in a series of wells in the development of a 50 MWe geothermalrnpower plant, which is likely to become the first grid connected geothermal power plant in Australia.rnA Pre-Feasibility study has also been compiled to assess the total cost per MWh of power produced after taking into account all plant and pump requirements. This study found that electricity can be sustainably generated at a cost of AUD63 per MWh.
机译:Panax地热有限公司(“ Panax”)已在南澳大利亚州东南部奥特韦盆地的槽或grab斗中的四个热沉含水层(HSA)中获得了数个地热勘探许可证(GEL),面积超过3,000 km〜2。石灰石海岸地热项目旨在提供第一个证明,即澳大利亚沉积盆地内的常规地热资源可用于产生大量具有价格竞争力,零排放的基本负荷电力。由于石油工业已获得一个现有的综合数据库,其石灰石海岸地热项目的最初开发重点是Penola槽(GEL223)。rnPenola槽已进行了密集的油气勘探,包括27口深层石油井和电缆测井和储层孔隙度和渗透率的常规岩心测量。此外,还有271 km〜2的3D地震和大量的2D地震数据。这些数据可作为“打开文件”数据库的一部分获得,研究表明,Penola槽的厚度超过1,000m的白垩纪俏丽山地层(砂岩)具有大流量输送> 140℃的地热水的能力,足以商业中温地热发电厂的运行。最近的一项独立的地热资源评估表明,该地区的发电潜力很大。该评估估计Penola槽的“实测地热资源”为11,000PJ。rn第一口井Salamander 1是该州一系列井中的第一口50 MWe地热发电厂的开发,这很可能会成为澳大利亚首个并网的地热发电厂。rn还进行了预可行性研究,评估了所有发电厂和电厂后的每兆瓦时发电总成本。泵的要求。这项研究发现,以每兆瓦时63澳元的成本可持续地发电。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号