首页> 外文会议>Geotechnical aspects of underground construction in soft ground >Minimizing overbreak and underbreak using abrasive waterjet technology in underground excavation
【24h】

Minimizing overbreak and underbreak using abrasive waterjet technology in underground excavation

机译:在地下挖掘过程中使用磨料射流技术最大程度地减少上冲和下冲

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Major metropolitan areas increasingly require the construction of underground spaces such asrna tunnel for the effective use of limited urban areas. The blasting method is broadly used for rock excavationrnworldwide because of its efficiency. The blasting induced overbreak and underbreak occur in the vicinity ofrnthe underground opening; the overbreak and underbreak can decrease the reliability of underground spacesrnand increase support (reinforcement) cost and time. An abrasive waterjet technology can be effectively utilizedrnalong with the blasting method during the rock excavation process by forming a clear outline of a tunnel andrnunderground space in advance, which results in a reduction of overbreak and underbreak during the blastingrnprocess. In this study, an alternative excavation method using the abrasive waterjet to minimize the overbreak andrnunderbreak is introduced. In addition, experimental and analytical studies are performed to verify the minimizingrneffects of the overbreak and underbreak in tunnelling.
机译:为了有效利用有限的市区,主要的大都市区日益要求建造地下空间,例如纳纳隧道。爆破方法因其效率高而被广泛用于全世界的岩石开挖中。爆破引起的下冲和下冲发生在地下洞口附近。上冲和下冲会降低地下空间的可靠性,并增加支撑(加固)的成本和时间。通过在岩石开挖过程中预先形成清晰的隧道和地下空间轮廓,可以有效地在喷砂方法中充分利用磨料喷水技术,从而减少了喷砂过程中的下沉和下沉。在这项研究中,介绍了一种使用磨料喷水的开挖方法,以最大程度地减小上冲和下冲。此外,进行了实验和分析研究,以验证隧道效应中的下陷和下陷的最小化影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号