GEOTEXTILE TUBE APPLICATION AS THE COFFERDAM AT THE FORESHORE WITH LARGE TIDAL RANGE FOR INCHEON BRIDGE PROJECT

机译:土工布管在仁川大桥项目大潮汐前缘中作为COFFERDAM的应用

获取原文
获取原文并翻译 | 示例

摘要

Design details and construction procedures of the large-scale geotextile tube works as the cofferdam of the temporary access road for Incheon Bridge constructions are introduced. 18.25 km long sea-crossing lncheon Bridge connects Incheon International Airport with the international free economic zone at New Songdo City in Incehon.Construction site is a foreshore which the tidal range is up to 9.27 m and the subsurface consists of soft silty clayey soil.There were so many difficulties in installation of the geotextile tube on the soft tidal flat due to huge differences in the water level between ebb and flow. The diameter of polyethylene tube is 4 m, or 5 m and the length of each tube is 50 m.Sands were used as a filling material instead of dredges soils which was originally planed to fill the tube. Hydraulic pumping of sand mixed water to the tube through multiple injection ports gave advantages to reduce the construction time and to maximize the tube size after the injection completion. Two sets of the 4 m diameter tubes were installed on the ground surface and 3 tubes of 5 m diameter were stacked on these tubes in sequence. Special featured sand filled fabric forms were spread at each stacked layer to increase the friction between the tube surfaces. Polyester geotextile mat was used as a scour protection apron and post piles fixed the mat to the ground. Various kinds of offshore equipment including flat barges were used and working schedule was planned according to the information of tidal range. Instrumentations have been also performed to monitor the behavior of the geotextile tube.
机译:介绍了作为仁川大桥施工临时通道的围堰的大型土工布管工程的设计细节和施工程序。仁川国际机场与仁川新松岛市国际自由经济区之间长18.25公里的跨海龙琴桥相连接,施工现场是前滩,潮汐范围高达9.27 m,地下由软质粉质黏土组成。由于潮汐和流量之间的水位差异很大,在柔软的滩涂上安装土工布管有许多困难。聚乙烯管的直径为4 m或5 m,每根管的长度为50 m。使用沙子作为填充材料,而不是疏originally最初计划填充该管的土壤。通过多个注入口将沙子混合水通过液压泵送至管具有减少施工时间并在完成注入后最大化管尺寸的优势。将两组直径为4 m的管安装在地面上,并依次将3个直径为5 m的管堆叠在这些管上。特殊功能的填沙织物形式散布在每个堆叠层上,以增加管表面之间的摩擦。聚酯土工布垫用作防冲刷围裙,桩桩将其固定在地面上。根据潮汐范围的信息,使用了包括平驳船在内的各种海上设备,并计划了工作时间表。还已经执行了仪器来监测土工布管的行为。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号