首页> 外文会议>Geosynthetics 2009 >Design of Uranium Mill Facility Liner Systems for the Pi?on RidgeProject
【24h】

Design of Uranium Mill Facility Liner Systems for the Pi?on RidgeProject

机译:Pi?on RidgeProject铀厂设施衬板系统的设计

获取原文
获取原文并翻译 | 示例

摘要

The regulatory environment regarding the processing of uranium ore was altered dramatically in 1992 as a result ofrnmajor federal regulatory changes, making achieving regulatory compliance a greater challenge for a new facility. Onernmajor modification to the regulations is identification of prescriptive liner systems for surface impoundments (i.e., tailingsrncells and evaporation ponds). Strategically located within the Uravan Mineral Belt District, the Pi?on Ridge Project is thernfirst new uranium mill being proposed for construction in the United States in over 25 years. Proposed as a 6.3 millionrntonne uranium milling operation, the mill will receive uranium ore from a variety of sources. The project includes designrnand permitting of three 12.3-hectare tailings cells, 16.2 hectares of evaporation ponds, and an ore stockpile pad. Thisrnpaper will focus on the liner system requirements and designs for the various facilities.
机译:由于主要的联邦法规变更,有关铀矿石加工的法规环境在1992年发生了巨大变化,这使得对法规的遵守成为新工厂面临的更大挑战。对该法规的主要修改是识别用于表面蓄水的规定性衬垫系统(即尾矿池和蒸发池)。 Pi?on Ridge项目位于Uravan矿产带地区的战略位置,是提议在25年内在美国建造的第一个新铀厂。拟议中的该厂将进行630万吨的铀矿开采,将从各种来源接收铀矿石。该项目包括设计和许可三个12.3公顷的尾矿库,16.2公顷的蒸发池和一个矿石堆场。本文将着重于各种设施的班轮系统要求和设计。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号