Managing Risk in Design-Build: Lessons for Geotechnical Professionals

机译:管理设计建造中的风险:岩土工程专业人士的经验教训

获取原文
获取原文并翻译 | 示例

摘要

Design-build projects are challenging for the geotechnical professional. Thesernprojects are predominantly schedule driven, and as a result, the geotechnicalrnprofessional is "late" from the date of notice to proceed. Geotechnical professionalsrncan limit their financial risk on design-build projects by understanding the designbuildrnphilosophy, contracting method, project difficulty, design pace, post-designrnservice needs during construction, and leveraging the few tasks that are under therngeotechnical professionals' control. As more major public infrastructure projects arernbeing designed and constructed under the design-build model, the geotechnicalrncommunity must protect itself from financial losses on these very large andrndemanding projects. This paper summarizes the author's lessons learned on largerntransportation projects with the purpose of improving the financial outcome andrnprofessional satisfaction for the geotechnical practitioner on design-build projects.
机译:设计建造项目对岩土工程专业人士而言具有挑战性。这些项目主要是按时间表进行的,因此,从通知之日起,土力工程专业处于“后期”。岩土技术人员可以通过了解设计理念,合同方法,项目难度,设计进度,施工后的设计服务需求,并充分利用受工程技术人员控制的几项任务,来限制设计施工项目的财务风险。随着越来越多的大型公共基础设施项目正在按照设计建造模式进行设计和建造,岩土工程社区必须保护自己免受这些非常大且要求高的项目的财务损失。本文总结了作者在大型运输项目中的经验教训,目的是为岩土工程从业人员改善设计建造项目的财务成果和专业满意度。

著录项

  • 来源
    《Geo-Frontiers 2005》|2005年|1-11|共11页
  • 会议地点 Austin TX(US)
  • 作者

    Elizabeth M. Smith;

  • 作者单位

    Kleinfelder, 3601 Manor Road, Austin, TX, 78723, PH (512) 926-6650, FAX (512) 926-3312, email: lsmith@kleinfelder.com;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号