首页> 外文会议>Gas technology symposium >Pitfalls of Injection/Falloff Testing in Coalbed Methane Reservoirs
【24h】

Pitfalls of Injection/Falloff Testing in Coalbed Methane Reservoirs

机译:煤层气储层注入/降落测试的陷阱

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Analysis of numerous injection/falloff tests in the field, primarily on coalbed methane wells, has led to a better understanding of the requirements for proper injection/falloff testing. because most of the formations do not flow prior to testing, test design is difficult and many of the testing procedures must be modified during the test itself. If a testing program is not carefully designed and implemented, erroneous results for permeability and skin factor can be obtained, even though the analysis results appear reasonable. This paper outlines some general guidelines for injection/falloff testing of coalbed methane and other low permeability reservoirs. Using several field-based examples, potential analysis pitfalls are highlighted including 1) injection above fracture pressure, 2) non-stable reservoir pressure prior to testing, and 3) a poor connection between the wellbore and reservoir. Any of these conditions may result in pressure responses which appear analyzable, but which give misleading or erroneous results.
机译:对主要在煤层气井上进行的大量注入/沉降测试的分析,使人们对正确的注入/沉降测试的要求有了更好的了解。因为大多数地层在测试之前不会流动,所以测试设计很困难,并且许多测试程序必须在测试本身期间进行修改。如果没有精心设计和实施测试程序,即使分析结果看起来合理,也可能会获得有关渗透率和集肤系数的错误结果。本文概述了煤层气和其他低渗透油藏注水/降落测试的一些一般准则。使用几个基于现场的示例,突出显示了潜在的分析隐患,包括1)高于裂缝压力的注入,2)测试之前不稳定的储层压力以及3)井眼与储层之间的连接不良。这些条件中的任何一种都可能导致压力响应,这些压力响应看来是可分析的,但会产生误导性或错误的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号