首页> 外国专利> Methods and apparatus for estimating physical parameters of reservoirs using pressure transient fracture injection/falloff test analysis

Methods and apparatus for estimating physical parameters of reservoirs using pressure transient fracture injection/falloff test analysis

机译:利用瞬态压裂裂缝注入/沉降试验分析估算储层物理参数的方法和装置

摘要

A before-closure pressure-transient leakoff analysis for a fracture-injection/falloff test is used to mitigate the detrimental effects of pressure-dependent fluid properties on the evaluation of physical parameters of a reservoir. A fracture-injection/falloff test consists of an injection of liquid, gas, or a combination (foam, emulsion, etc.) containing desirable additives for compatibility with the formation at an injection pressure exceeding the formation fracture pressure followed by a shut-in period. The pressure falloff during the shut-in period is measured and analyzed to determine permeability and fracture-face resistance by preparing a specialized Cartesian graph from the shut-in data using adjusted pseudodata such as adjusted pseudopressure data and time as variables in a first method, and adjusted pseudopressure and adjusted pseudotime data as variables in a second method.
机译:闭合注入前的瞬态渗漏分析(用于压裂/压降测试)用于减轻压力相关流体特性对储层物理参数评估的不利影响。压裂/塌陷试验包括注入液体,气体或含有所需添加剂的混合物(泡沫,乳液等),以便在超过地层压裂压力的注入压力下与地层相容,然后关闭期。在第一种方法中,通过使用调整后的伪数据(例如调整后的伪压力数据和时间)作为变量,根据闭锁数据准备专门的笛卡尔图,从而测量和分析闭锁期间的压力下降,以确定渗透率和裂缝面阻力,在第二种方法中,将调整后的伪压力和调整后的伪时间数据作为变量。

著录项

  • 公开/公告号AU2005229230B2

    专利类型

  • 公开/公告日2010-07-01

    原文格式PDF

  • 申请/专利权人 HALLIBURTON ENERGY SERVICES INC.;

    申请/专利号AU20050229230

  • 发明设计人 DAVID P. CRAIG;

    申请日2005-02-22

  • 分类号E21B49;

  • 国家 AU

  • 入库时间 2022-08-21 18:41:53

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号