摘要

As oil and gas developments continue into deeper waters the need for infrastructure to support that growth is increasing. Transportation of the petroleum products is a key consideration in determining the method of a development and the overall cost of a project. Smaller and marginal prospects may not be justified in an economic analysis if the transportation costs are too great. Transportation system cost can be reduced and efficiencies maximized by tying smaller flow lines into large pipelines. Deepwater tie-ins do present many unique challenges for equipment manufacturers and installation contractors. There are several methods to accomplish deepwater tie-ins during the initial construction phase. However, after a pipeline is installed and operating, tying a new line into it requires hot tapping. Until the development of Deep Tap there has been no method for completing a hot tap in deepwater.
机译:随着石油和天然气的发展继续向更深的水域发展,对支持这种增长的基础设施的需求正在增加。石油产品的运输是确定开发方法和项目总成本的关键考虑因素。如果运输成本过高,则在经济分析中可能无法证明较小的边际前景是合理的。通过将较小的流水线绑在大型管道中,可以降低运输系统的成本并最大程度地提高效率。深水连接确实为设备制造商和安装承包商带来了许多独特的挑战。在初始施工阶段,有几种方法可以完成深水连接。但是,在安装并运行管道之后,将新管道连接到该管道需要热攻。在开发Deep Tap之前,还没有方法可以在深水中完成热龙头。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号