Roller Compacted Concrete arch dam of Northwest Cold Area in China ― Longshou arch dam

机译:西北寒区碾压混凝土拱坝―龙首拱坝

获取原文
获取原文并翻译 | 示例

摘要

The thin Longshou double curvature arch dam is located in Gansu Province in the northwest of China, which is featured by the extreme conditions of a typical mainland climate: extremely cold winter and extremely hot summer with an annual temperature range of 70℃, high aridness and heavy evaporation. The seismic intensity scale of this area is 8. The dam of the Longshou Hydropower Station is characterized by relatively great height, thin thickness, and complicated composition. The dam is consisted of three parts: a double curvature arch dam, a gravity dam and a thrust pier. In the thin double curvature arch dam there are three outlets at the middle height and two surface orifices for flood discharge and sand sluicing in combination with a scour bottom outlet. The dam is made from RCC. It is the only anti-seepage element and has to be resistant to freezing. In the mix design, a amount of magnesium oxide and expansion agent is added for higher cracking resistance. In the material study, different types of concrete for different purposes such as anti-freezing, anti-seepage or anti-abrasion were made utilizing the natural sand and stone of the local gobi desert. And concrete of different scales for the respective use of the arch dam, gravity dam and thrust pier was made accordingly. River water was used directly as the major and simple measure for temperature control of the dam body to reduce the cost. The Longshou Dam was completed within only 14 months in 2001. It is 80 m in height and is recorded as the highest, thinnest RCC arch dam with the shortest construction duration in the world.
机译:龙寿双曲拱薄坝位于中国西北部的甘肃省,其特征是典型的大陆性气候的极端条件:冬季极冷,夏季极热,年温度范围为70℃,干旱高,大量蒸发。该地区地震烈度等级为8。龙寿水电站大坝高度较高,厚度较薄,组成复杂。该坝由三部分组成:双曲拱坝,重力坝和推力墩。在薄的双曲拱拱坝中,在中间高度处有三个出口,在与冲刷底部出口相结合的地方有两个用于泄洪和泄水的表面孔。该水坝由RCC制成。它是唯一的防渗元素,必须具有抗冻性。在混合料设计中,添加了一定数量的氧化镁和膨胀剂以提高抗裂性。在材料研究中,利用当地戈壁沙漠的天然沙子和石头制作了用于不同目的的不同类型的混凝土,例如防冻,防渗或防磨。相应地制作了分别用于拱坝,重力坝和推力墩的不同比例的混凝土。直接使用河水作为控制坝体温度的主要和简单措施,以降低成本。龙首大坝在2001年仅用了14个月便建成。它的高度为80 m,是世界上建造时间最短,最高,最薄的RCC拱坝。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号