首页> 外文会议>Forth International Symposium on Roller Compacted Concrete (RCC) Dams; Nov 17-19, 2003; Madrid, Spain >Dona Francisca Hydroelectric power plant ― design and construction of the RCC structures
【24h】

Dona Francisca Hydroelectric power plant ― design and construction of the RCC structures

机译:多纳·弗朗西斯卡(Dona Francisca)水力发电厂― RCC结构的设计与施工

获取原文
获取原文并翻译 | 示例

摘要

Dona Francisca HPP on the Jacui River, in the State of Rio Grande do Sul, in the southern region of Brazil, have a installed capacity of 125 MW. Its construction started in 1998 and the commercial generation of the first unit happened in February 2001 and the second one started in April 2001. Dona Francisca HPP is the last downstream hydropower scheme in the cascade of Jacui River, in which are in operation the Itauba, Jacui, Passo Real and Ernestina hydropower plants. This paper describes, besides the RCC aspects for design and construction, general aspects of the layout, foundation, drainage and instrumentation.
机译:位于巴西南部里奥格兰德州南部贾翠河的Dona Francisca HPP的装机容量为125兆瓦。它的建设始于1998年,第一台机组的商业化发电发生在2001年2月,第二台机组的商业发电发生于2001年4月。Dona Francisca HPP是Jacui河梯级中的最后一个下游水电计划,伊塔巴河正在运行。 Jacui,Passo Real和Ernestina水力发电厂。本文除了介绍RCC的设计和施工方面,还介绍了布局,基础,排水和仪表的一般方面。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号