首页> 外文会议>Flood Defence'2002 vol.1 >Backwater computation for choked flood flows through bridge contractions
【24h】

Backwater computation for choked flood flows through bridge contractions

机译:通过桥梁收缩的cho水洪水的回水计算

获取原文

摘要

Choked flood flows caused by sever bridge contractions were studied in this paper. A new method for the computation of backwater elevation for choked flows through bridge contractions was proposed. This new method was derived from the conservation of energy and the water continuity. The critical flow condition at the contraction, which forms a control section for the flow upstream of the contracted reach, was considered. The applicability of the proposed method was tested by a large flood which occurred at I-5 bridge over Los Gatos Creek neat Coalinga, California in 1995.
机译:本文研究了桥梁严重收缩引起的水流量。提出了一种计算桥梁收缩bridge水回水高度的新方法。这种新方法源自节能和水的连续性。考虑了收缩时的临界流量条件,该条件形成了收缩流量上游的控制部分。该方法的适用性已通过1995年在加利福尼亚Loss Gatos Creek整洁Coalinga的I-5桥上发生的大洪水进行了测试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号