Microtunnel - Recouping from pitfalls

机译:微隧道-从陷阱中恢复

获取原文
获取原文并翻译 | 示例

摘要

This paper describes a microtunnel project that was in planning for five years and whose actual construction time was three months. The paper describes the study report, plans and specifications, subsurface investigations, manufacture and inspection of jack pipe, description of concurrent projects on the same site, the microtunnel project including construction procedures, what actually happened, the contractor's claim and the determination of the claim's merits. On the whole, the constructed project achieved the goal of the plans and specification.
机译:本文描述了一个微隧道项目,该项目正在计划中,为期五年,实际建设时间为三个月。该文件描述了研究报告,计划和规格,地下调查,顶管的制造和检查,在同一地点的并发项目的描述,包括施工程序的微隧道项目,实际发生的情况,承包商的索赔以及对索赔的确定优点。总体而言,已完成的项目达到了计划和规范的目标。