首页> 外文会议>FAIM(Flexible Automation and Intelligent Manufacturing) 2005 vol.1 >From the Customer's Inquiry to the Production Network with Partners having equal Rights-the Activity of the Determination of the Production Process
【24h】

From the Customer's Inquiry to the Production Network with Partners having equal Rights-the Activity of the Determination of the Production Process

机译:从客户的询问到具有平等权利的合作伙伴的生产网络-确定生产过程的活动

获取原文
获取原文并翻译 | 示例

摘要

The research of non-hierarchical production networks at Chemnitz University of Technology deals with a special kind of production networks. They base on concrete customers' orders and so they are temporally limited. Furthermore, those networks are characterized by aflat hierarchy, which means that there is no focal network participant and all potential network participants within a pool of resources have equal rights. The management system for the networks - the Extended Value Chain Management (EVCM) - must ensure the selection of the network participants and thus the formation of the production network according to this character. A special problem in this context is the preparation of the customer's inquiries and the determination of the technological process for the production network. The paper introduces an approach for this process including the product development, process and quality planning whereby the non-hierarchical character is considered. The necessary activities starting with an inquiry up to the plans for the selection of the participants of the actual manufacturing process are described. The developed approach represents an important part of the management system for non-hierarchical production networks. The definition of the activities to determine the technological production process forms the basis of a support within an IT-infrastructure.
机译:开姆尼茨工业大学对非分层生产网络的研究涉及一种特殊的生产网络。它们基于具体客户的订单,因此在时间上受到限制。此外,这些网络的特点是层次结构扁平,这意味着没有焦点网络参与者,并且资源池中的所有潜在网络参与者都具有平等的权利。网络的管理系统-扩展价值链管理(EVCM)-必须确保选择网络参与者,从而确保根据此特征形成生产网络。在这种情况下,一个特殊的问题是准备客户的询问以及确定生产网络的技术过程。本文介绍了此过程的一种方法,其中包括产品开发,过程和质量计划,其中考虑了非分层特性。描述了必要的活动,从查询开始直至选择实际制造过程参与者的计划。所开发的方法代表了非分层生产网络管理系统的重要组成部分。确定技术生产过程的活动的定义构成了IT基础架构内支持的基础。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号