【24h】

A SIMULATION STUDY OF THE MAKE-TO-STOCK AND MAKE-TO-ORDER PRODUCTION

机译:订单生产和订单生产的模拟研究

获取原文
获取原文并翻译 | 示例

摘要

In order to keep competitive, it is common for manufacturing companies in several industrial sectors to offer the possibility for product customization. However, the delivery times may become quite long, particularly if the utilization of resources is high. Therefore, in order to maintain delivery times short, products may be manufactured in two stages. In the first, standard components are made-to-stock. In the second, these components are customized into different end products. The paper investigates the impact of load-based order release to the second stage, when combined with a simple replenishment control policy at the first stage. We also investigate the impact of unbalanced workloads between the two stages. Results of a simulation study show that extra capacity at the first stage have a greater positive effect on the percentage of tardy orders, while extra capacity at the second stage, only slightly influence this.
机译:为了保持竞争力,多个行业的制造公司通常会提供产品定制的可能性。但是,交货时间可能会变得很长,尤其是在资源利用率很高的情况下。因此,为了保持较短的交货时间,可以分两个阶段制造产品。首先,标准组件是按库存生产的。第二,将这些组件定制为不同的最终产品。本文研究了在第一阶段结合简单的补货控制策略时,基于负荷的订单下达对第二阶段的影响。我们还研究了两个阶段之间工作负载不平衡的影响。模拟研究的结果表明,第一阶段的额外容量对迟到订单的百分比具有更大的积极影响,而第二阶段的额外容量则对此影响很小。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号